Clayton County Culverts Replacement
Phase 1 & 2
Client: Clayton County Water Authority
Project Location:
- Flat Shoals Road Culvert Crossing Near East Fayetteville Road
- Pine Ridge Drive Culvert Crossing Near US Highway 41
- Cynthia Lane Culvert Crossing Near US Highway 41
- Southlake Parkway 1 Crossing Near Arbor Place Drive
- Southlake Parkway 2 Crossing Near Arbor Place Drive
- Southlake Parkway 3 Crossing Near Arbor Place Drive
Project Description:
Benchmark Management is the engineer-of-record (EOR) for the 6 culvert replacement projects. Benchmark Management provided the Clayton County Water Authority with hydrological study, hydraulic modeling, & detailed engineering design. Benchmark Management also provided engineering support during construction.
Services Provided:
- Project Management & QA/QC Review
- Data Collection, Geotechnical Investigation
- Hydrologic and Hydraulic Modelling
- Engineering Design Deliverable
- Bid Documents
- Permitting Support
- Public Outreach and Community Engagement
- Bid Phase Support