Airfield Sewer Enhancements

Grades 4 and 5

Honey Creek Pump Station Improvements

Client: Atlanta Department of Aviation (DOA)

Project Location: Atlanta, Georgia

Project Description:

The rehabilitation and repair of approximately 6,500 linear feet of various size existing sanitary sewer pipe ranging in diameter from 8 inches up to 36 inches, located at various areas throughout the northern and central airfield within SIDA, as well as outside of SIDA at South Cargo. The amount of rehabilitation is identified as either a Grade 4 or Grade 5 based off the NASSCO PACP scale and the method of selected rehabilitation is via the Sekesui spiral wound liner repair method which is expected to reduce the need for extensive bypass systems on the airfield, can be installed during low-flow, off-peak hours overnight, and minimizes impacts to regular airport operations.

Services Provided:

  • Engineering Design
  • Hydrologic & Hydraulic Modeling
  • Erosion Control
  • Construction Administration
  • Traffic Control
  • Engineering & Construction Cost Estimate